- home
- Case study
Valdel EC
Valdel enhancing the piping system of Lone Star NGL Fractionators Mariner Project
CLIENT
Energy Transfer Partners L P (ETP) / Lone Star NGL Fractionators Mariner Project
CLIENT REQUIREMENT
Study & optimization of supports for Feed Dehydrator piping system that carries HD-5 Feed (Liquid) & Regenerative Fluid (Vapour) in the same pipe at different operating cycle.
OUR ANALYSIS
Expert engineers at Valdel EC was aware of CAESAR-II software’s limitation in analyzing such systems. The study was carried out as two separate systems based on operating cycle, adsorbing and regenerating.
OUR APPROACH
Both the results were combined and analyzed Valdel EC engineers to achieve the optimal support configuration for the system, which avoids expensive and maintenance prone supports like spring supports.
CLIENT BENEFITS
The supporting arrangement set up by Valdel is highly reliable, cost effective & maintenance free. The system is operating successfully.
Business together
your Needs, Our Solutions
Leave your details and feedbacks below. We are here to assist you on your queries regarding our services.