preloader

Valdel EC

Anand – Rajkot Natural Gas Pipeline Project

back

Owner Gujarat State Petronet Ltd.(GSPL)
Location Anand, Gujarat

Project Description

Installation of 24”x 225 km Natural gas pipeline between Anand terminal to Rajkot terminal Gujarat, India. Project also include a 18” x 68km spur line to morbi and includes construction of 9 nos. block valve stations and 2 nos. intermediate pigging stations along the main pipeline route.

Scope of Work

Basing design including site visits as required for technical feasibility and gathering inputs.

Development of EPC enquiry specification, data sheet and evaluation of EPC bids

Preparation of preliminary layout drawings, Pipeline Alignment, Crossing, Route map & Typical standard drawings

Post EPC order: Owner’s engineering, review of EPC engineering, construction supervision covering HSE, pipeline / piping / mechanical, civil, E&I.

Business together

your Needs, Our Solutions

Leave your details and feedbacks below. We are here to assist you on your queries regarding our services.

Attention

Attention

This website is best viewed in portrait mode.