Momentum Fractionation Plant
 

M/s UTICA EAST OHIO MIDSTREAM is installing new NGL Fractionation in Harrison County, Ohio the contract is awarded to S&B. VEC is entrusted by S&B to perform detailed engineering services for this project. The total project consists of two 45,000 BPD NGL Fractionation units which will be executed in a 2 stage concept. Stage 1 will consist of Frac 1 unit, storage (Bullet tanks and atmospheric tanks), and utilities services as required and loading facilities for products.

The engineering was completed on August 2013.